Repairs & Energy

Smarter, less expensive repairs. Better performance.

160,000 SF office building · Pasadena, CA

The owners' HVAC vendor recommended an entirely new HVAC controller at a cost of $86,250.

Based on in-house expertise as master system integrators, inginir re-evaluated the vendor's proposal and delivered a better and less expensive controller solution with the exact required feature set, then added controls for the rooftop boiler and cooling tower, improving both savings and sustainability.

Reduced daily runtime extended equipment operating life, eliminating looming CapEx exposure across a 500-ton chiller ($225K), a 500-ton cooling tower ($300K), and a 60-ton RTU ($600K).

$57,550Unnecessary repairs avoided
574,857 kWhEnergy saved, $96,000 in cost
LongerEquipment operating life